Concrete pump truck hydraulic system daily inspection and maintenance how to do

2021-10-23 08:22:39
times

Concrete pump truck hydraulic system daily inspection and maintenance how to do:

1. Daily check whether the hydraulic oil is pure in emulsification. It is generally caused by the infiltration of water into the hydraulic oil, which requires you to drain the pump tank regularly. (Approximately the pump truck does not work for 60 hours once drainage)

混凝土泵车报价

2. Check the oil level table of the pump truck to ensure that the hydraulic oil level can not be lower than the lower working level. If it is lower than the level, it needs to be added immediately.


3. Check whether the heat dissipation system of the pump truck works normally.

混凝土泵车报价

4, check whether there is oil leakage in the hydraulic pipeline.


5, mixing system and transfer box are prone to hydraulic oil leakage, generally mixing system hydraulic oil water, transfer box part, oil into the hydraulic system, so, once the stirring system is found to have oil leakage, please replace the seal in time.

混凝土泵车报价


混凝土泵车报价

Recently Viewed:

Related products

news.related_news

Scan for consultation

Phone: +86+13730927018

Fax: +86+0532-89651313

Email address: coneleoffice@163.com

Address: No. 413, Tieqishan Road, Chengyang District, Qingdao


Sales Hotline:

+86+0532-87876387

Copyright © CO-NELE GROUP All rights reserved Filing No.:鲁ICP备09030349号-6 Mainly engaged inConcrete pump truck, concrete pump, concrete delivery pump, Welcome to inquire!