新闻资讯

News

current position: Home > News > Technical knowledge

ContactContact Us

CO-NELE GROUP


Address: No.413,Tieqishan Road,Chengyang District,Qingdao


Sales hotline: +86+0532-87876387    +86+13730927018


Company fax: +86+0532-89651313

 

Service hotline: +86+400-6362101


Concrete pump truck block pipe you need to do this

2021-12-29 15:53:59
times

Concrete pump truck anti-blocking pipe you need to do this:

Regardless of the size of the site, prior to the construction of the corresponding planning and design, concrete pump truck installation and design of the pipeline, as far as possible to avoid 90° and S bend. Try not to use the pump pipe with obvious pits, in order to reduce the resistance of pumping concrete, prevent blocking. Usually, if the pump is often switched between high and low pressure, the hopper of the pump truck needs to be raised about 20cm, so as to increase the hopper product, so as to ensure that the concrete will not flow out.

混凝土泵车哪家好

Because the 700 type of forced mixer in unloading, it is better to finish unloading, so that the flow into the hopper of the concrete force is evenly proportioned. At the same time, in order to ensure the continuity of pumping concrete and ensure the quality of concrete pouring, the interval time in the operation should not be too long to prevent clogging.

混凝土泵车哪家好

In addition to the reasonable use of the mixer, the pump tube should be checked regularly. If the wear degree of the pump tube in one direction is large, the tube should be switched to the other position in time. If the thickness of the pump tube is too thin, the new tube should be replaced in time to prevent the pump tube from exploding in the process of work or plugging caused by the replacement of the pump tube for a long time. Because one of the reasons for blocking the pipe is the long interval between stops, so the construction personnel should start a pump every 20 minutes or so or several times of reverse and positive pump, if necessary, the circulation pump to prevent blockage.

混凝土泵车哪家好

If the unloading, the back of the concrete stone is more, especially when the concrete slump is larger, more attention should be paid to, if it is a large volume of mixing and machine, can do a storage hopper in advance, to ensure continuous feeding.

混凝土泵车哪家好

Recently Viewed:

Related products

news.related_news

Scan for consultation

Phone: +86+13730927018

Fax: +86+0532-89651313

Email address: coneleoffice@163.com

Address: No. 413, Tieqishan Road, Chengyang District, Qingdao


Sales Hotline:

+86+0532-87876387

Copyright © CO-NELE GROUP All rights reserved Filing No.:鲁ICP备09030349号-6 Mainly engaged inConcrete pump truck, concrete pump, concrete delivery pump, Welcome to inquire!